tdchrom tdchrom
  • en
    • gr
  • Who we are
  • Services
  • Projects
  • CUSTOMERS – ASSOCIATES
    • Customers
    • ASSOCIATES
  • ISO
  • News
  • Contact
  • Who we are
  • Services
  • Projects
  • Customers
  • Partners
  • News
  • ISO
  • ISO
  • Contact
  • en
  • gr
BACK TO PROJECTS
Project Title Contractor Year Location Description
TUNNEL CORINTH – PATRA AVAX 2025 CORINTHOS - PATRA

Painting and repainting of half-shelters and tunnels of the Corinth – Patras section, area 150,000m2.

HIGHWAY AKTIO – AMVRAKIA METKA S.A 2024 VONITSA

Antifouling paint system on concrete surfaces, total area 5,000m2

ATTICA ROAD HIGHWAY AVAX 2024 ATHENS

Antifouling paint system on concrete surfaces, total area 121,000m2

PIRAEUS TOWER TERNA S.A 2022 PIRAEUS

The project as a whole concerns the completion and operation of the Piraeus Merchant and Shipping Center, known as Piraeus Tower, with 22 floors while the height of the building is 88 meters. Piraeus Tower planned utilization of offices, restaurants and underground parking.

Below are our contracting works:

  • Application of passive fire protection system R90min and R120min with cementitious mortar on slabs, beams and external pillars of the building.
  • Strengthening and repair of the existing reinforced concrete using FRP systems. For corrosion protection and concrete repair, used surface applied inhibitor and  repair mortar. For fire protection used cement based mortar.
  • Application of a passive fire protection system R90min with fire-resistant paint in the metal structure of the building.
  • Application of C5-M corrosion protection system
DESFA EDIL 2019 REVITHOUSA

Painting of firefighting pipes and metal structures in Tank A and Tank B

GOLDEN UNION REDEX 2019 LYKOVRISI

Luxury paint in a central circular staircase from a concrete surface

NEW BUILDING VIOPOL VIOPOL 2019 SXIMATARI VIOTIAS

Application of Passive Fire Protection System in ΕΝ13381-8 to steel construction

GREECE AIRPORTS INTRAKAT 2018 AKTIO - THESSALONIKI - ZAKYNTHOS - KEFALONIA

AKTION AIRPORT

  • Application of Anticorrosion Protection System C3/Medium and C4/High

 

THESSALONIKI AIRPORT  (SKG)

  • Application of Anticorrosion Protection System C3/High

ZAKYNTHOS AIRPORT “DIONYSSIOS SOLOMOS”

  • Application of Passive Fire Protection System R60min and R90min in ΕΝ13381-8:2013 to steel constructions.
  • Application of Anticorrosion Protection System C4/High

KEFALONIA AIRPORT “ANNA POLATOU”

  • Application of Passive Fire Protection System R60min in ΕΝ13381-8:2013 to steel constructions
  • Application of Anticorrosion Protection System C2
THE ORBIT TERNA 2018 ATHENS

Application of Passive Fire Protection System R60min in ΕΝ13381-8.

Application of Anticorrosion Protection System C3/Medium

Application of Epoxy Paint System

Re-painting of existing external metal staircases

 

Leed certification requirements

Piraeus Port Plaza Core Construction 2017 Piraeus
Exterior paint on surfaces of existing trapezoidal sheet metal.
Paint existing gutters.
The New Bioclimatic Office Building Core Construction 2017 Neratziotissa

Painting interior and exterior constructions.

New Super Store Plaisio Core Construction S.A 2017 Agia Paraskevi

Application of  Passive Fire Protection System R90min in ΕΝ13381-8 and final topcoat.

Cosmote TV Studios and Offices Spaces Dimand 2017 Kifissia

Application of Passive Fire Protection System R60min in ΕΝ13381-8 in C4/High enviroment category.

Application of Anticorrosion Protection System C3/Medium.

Multi-level building, Aggelikousis shipping group INTRAKAT 2017 Kallithea

Luxury paint on columns of concrete, with excellent aesthetic architectural effect of the final coating.

New Building Blum Hellas K.LIAROMATIS S.A 2016 MARKOPOULO

Application of Passive Fire Protection System R30min in ΕΝ13381-8 and final topcoat in Offices building.

Application of Passive Fire Protection System R60min in ΕΝ13381-8 and final topcoat in Warehouse building.

The Mall Athens Loading Dock LAMDA OLYMPIA VILLAGE 2016 MAROUSI

Removal of old paint system.

Application of  certified Passive Fire Protection System R60min in ΕΝ13381-8 and final topcoat.

Kotronis Plastics K.LIAROMATIS S.A 2015 Nafpaktos

Application of Passive Fire Protection System R90min in ΕΝ13381-8 and final topcoat

Lidl Hellas INTRAKAT 2015 Markopoulos

Application of Passive Fire Protection System R30min in ΕΝ13381-8 and final topcoat

New Patras Port K. LIAROMATIS S.A 2014 PATRA

Application of Passive Fire Protection System R60min and final topcoat.

Neuropublic Seven-storey Metal Building K.LIAROMATIS S.A & NEUROPUBLIC S.A 2014 Piraeus

Application of Passive Fire Protection System R90min in ΕΝ13381-8 and final topcoat.

Paint System pattern sheets (Symdeck).

Stavros Niarchos Foundation Cultural Center LIAROMATIS S.A & J/V IMPREGILO SPA – TERNA S.A 2014 Palaio Faliro
  • Application of Passive Fire Protection System in ΕΝ13381-8:2013 to steel constructions.
  • Application of Anticorrosion Protection System C3 & C5M.
  • Luxury paint on ferrocement slab panels.
  • Empossed coating system on opera main hall roof & balconies.
  • Epoxy protection system on opera walls.
  • Antistatic protection on national library walls.
The Mall Athens Former H&M LAMDA OLYMPIA VILLAGE S.A 2013 Marousi

Application of Passive Fire Protection System R60min and final topcoat.

Fulgor Metal Building EMEK S.A 2013 Korinthos

Application of Passive Fire Protection System R60min in EN13381 and final topcoat.

My Market K. KOULOURAS & SIA O.E 2012 Kapandriti

Application of Passive Fire Protection System R60min and final topcoat.

CASH & CARRY KON. KOULOURAS & SIA E.E 2012 Kilkis

Application of Passive Fire Protection System R30min and final topcoat.

Tsivolas Recycle I. LIAPIS GP 2012 Koropi

Application of Passive Fire Protection System R60min and final topcoat.

Uni-Pharma AKTOR ATE 2012 Kifisia

Application of Passive Fire Protection System R60min and final topcoat.

Elval K. LIAROMATIS S.A 2012 Inofyta Voiotias

Application of Passive Fire Protection System R60min and final topcoat

Omikron Production GM STEEL EPE 2011 Marousi

Application of Passive Fire Protection System R60min and final topcoat.

METRO CASH & CARRY ARIS HILAKOS & SIA E.E 2010 Sparti

Application of Passive Fire Protection System R60min and final topcoat.

Business Center AFOI MEGAGIANNI O.E 2010 Pikermi Attikis

Application of Passive Fire Protection System R30min and final topcoat.

Mall Center Athenian Capitol SOFMAN S.A 2010 Athens

Application of Passive Fire Protection System R60min and final topcoat.

Ikea / Leroy Merlin TERNA S.A. 2010 Ioannina

Application of Passive Fire Protection System R60min and final topcoat.

Supermarket Building ALDI ΑΚΤΩΡ ΑΤΕ 2009 Likovrisi Attikis

Application of Passive Fire Protection System R30min and final topcoat.

Supermarket Building ALDI ALPINE BAU GMBH 2009 Agrinio

Application of Passive Fire Protection System R30min and final topcoat.

ΜΕΤΡΟ SUPER MARKET CONSTEEL S.A 2009 Kalamata

Application of Passive Fire Protection System R60min and final topcoat.

New Building Alkon Konstantopoulos L.T.D SOFMAN S.A. 2009 Industrial Area Kerateas

Application of Passive Fire Protection System R45min and final topcoat.

Headquarters of Ellaktor AKTOR 2009 Kifissia

Removal of old paint system.

Application of Anticorrosion Protection System on metal surface.

Andrikopoulos Delivery Center AEBE X. XRISTOPOULOS SA 2009 Omvria Messatidos

Application of Passive Fire Protection System R60min and final topcoat

Storage and repackaging Handling Hellas S.A. CONSTEEL S.A. 2009 INDUSTRIAL AREA AVLONA

Application of Passive Fire Protection System R90min and final topcoat.

Metal Bridge ALLISOS S.A - WOG AG 2009 Node Kifissos Avenue and National Road Athens-Lamia

Removal of old paint system.

Application of Anticorrosion Protection System on metal surface.

Motor Oil SOFMAN S.A. 2009 Saints Theodoroi

Application of Anticorrosion Protection System on steel sections to used pipe refinery rack.

Aldi Construction Companies 2009

Contractor: ALPINE BAU GMBH

Location: AGRINIO

Description: Application of Passive Fire Protection System R30min and final topcoat.

 

Contractor: AKTOR ATE

Location: LIKOVRISI ATTIKIS

Description: Application of Passive Fire Protection System R30min and final topcoat.

 

Contractor: K.LIAROMATIS SA.

Location: PATRAS INDUSTRIAL AREA

Description: Application of Passive Fire Protection System R30min, R60min, R90min and final topcoat

 

 

ΜΕΤΡΟ SUPER MARKET AKTOR A.T.E 2008 Elefsis

Application of Passive Fire Protection System R60min and final topcoat

Commercial Warehouse with offices PE.LA DOMIKH L.T.D 2008 Aspropirgos Attikis

Application of Passive Fire Protection System R60min and final topcoat.

Recording Cultural Heritage of Municipalities Association Members EVDROMOS A.T.E 2008 Galatsi

Application of Passive Fire Protection System R30min and final topcoat.

New Building Loy System SOFMAN S.A 2008 Glyfada

Application of Passive Fire Protection System R90min and final topcoat.

Cultural Centre asvestokaminos EYDROMOS S.A 2008 Galatsi

Application of Passive Fire Protection System R30min and final topcoat.

Building Eurobank Leasing ARCON CONSTRUCTION S.A 2008 Marousi

Application of Passive Fire Protection System R60min, R90min and final topcoat.

Unιmac AKTOR S.A 2008 Koropi

Application of Passive Fire Protection System R60min and final topcoat.

ΑΒ Basilopoulos ARXIKON S.A 2008 Inofyta Voiotias

Application of Passive Fire Protection System R45min, R90min and final topcoat.

Metal Tower In KERAKOLL TECHNIKI ANODOS S.A 2008 Sximatari

Application of Passive Fire Protection System R60min and final topcoat.

Εlbisco AXILLEUS TECHNIKH S.A 2008 Pikermi

Application of Passive Fire Protection System R60min and final topcoat.

Building VIVECHROM K. LIAROMATIS S.A 2008 Aspropyrgos

Application of Passive Fire Protection System R60min and final topcoat.

Distribution Center (Logistics) Furniture SATO AKTOR S.A 2008 Mandra Attiki

Application of Passive Fire Protection System R60min and final topcoat.

Commercial Warehouse BIC TECHNIKI ANODOS A.T.E 2008 Saint Stephan

Application of Passive Fire Protection System R60min and final topcoat.

Ikea AKTOR S.A 2008 Larisa

Application of Passive Fire Protection System R60min and final topcoat.

Ikea H.M. Housemarket (Cyprus) LTD 2008 Lefkosia Cyprus

Application of Passive Fire Protection System R90min and final topcoat

Mastic Factory P & G Development S.A 2007 Chios

Application of Passive Fire Protection System R60min and final topcoat.

Ikea AKTOR S.A 2007 Egaleo

Application of Passive Fire Protection System R45min and final topcoat.

Warehouses ELTREKKA- TECHNOKAR XIDAS CONSTRUCTION 2007 Elefsina

Application of Passive Fire Protection System R60min and final topcoat..

Fotomatic EMVATIS S.Α 2007 Patisia

Application of Passive Fire Protection System R60min and final topcoat.

Metro Cash & Carry D.S. STEEL S.A 2006 Mandra Attikis

Application of Passive Fire Protection System R60min and final topcoat.

Metro Cash & Carry D.S. STEEL S.A 2006 Ksanthi

Application of Passive Fire Protection System R60min and final topcoat.ς.

Carrefour D.S. STEEL S.A 2006 Patra

Application of Passive Fire Protection System R60min and final topcoat.

MEGA Kotsovolos VENCON VARSOS S.Α 2006 Petrou Ralli

Application of Passive Fire Protection System R60min and final topcoat.

Airport Extension SILKAMET S.A 2006 Rodos

Application of Passive Fire Protection System R60min and final topcoat.

Greek Recycle Centre ZITA TECHNIKI L.T.D 2005 Saints Theodoroi

Application of Passive Fire Protection System R60min and final topcoat.

The Mall Athens J. & P. AVAX 2005 Marousi

Application of Passive Fire Protection System R60min and final topcoat.

Chemix S.A D.S. STEEL S.A 2005 Pallini

Application of Passive Fire Protection System R60min and final topcoat

Olympic Wrestling Hall J. & P. AVAX 2004 Ilion

Application of Passive Fire Protection System R60min and final topcoat

Olympic Boxing Hall Kataskevastiki J. Dimitriou L.T.D. 2004 Peristeri

Application of Anticorrosion Protection System and Passive Fire Protection System R60min.

Swimming Pools Olympic Stadium Kataskevastiki J. Dimitriou Ltd 2004 Marousi

Application of Anticorrosion Protection System in additional tiers and walk wales

Metal Tower Exercises in O.L.P EX. EL. MAK. METAL. 2004 Piraeus

Application of Anticorrosion Protection System

Suburban Railway Station D.S. STEEL S.A 2004 Koropi, Kantza, Pallini, N. Irakleio

Application of Anticorrosion Protection System

New Stadium Karaiskaki Kataskevastiki J. Dimitriou L.T.D. 2004 New Faliro

Application of Anticorrosion Protection System on Steel Staircases.

Sports Federation SEGA - 2003 Athens

Application of general paints in the Main Building.

 

New Hippodrome of Athens INTRAMET 2003 Athens

Application of Epoxy Paint System.

Suburban Railway Station DS STEEL SA

Year: 2006

Application of Alkyd Paint System at Station Pentelis Avenue.

 

Year: 2005

Application of Alkyd Paint System at Stations Koropi – Kantza – Pallini – N.Iraklio.

Carrefour Construction Companies

Contractor: D.S STEEL S.A

Year: 2006

Location: Patra

Description: Application of Passive Fire Protection System R60min and final topcoat.

 

Contractor: J&P AVAX

Year: 2005

Location: Messini

Description: Application of Passive Fire Protection System R60min and final topcoat.

 

Jumbo Construction Companies

Contractor: IONIKI ATEKE

Year: 2010

Location: PREVEZA

Description: Application of Passive Fire Protection System R60min and final topcoat.

 

Contractor: Κ.Ι. PRIOVOLOS Α.Ε.Β.Ε

Year: 2010

Location: PREVEZA

Description: Parking areas road marking

 

Contractor: PE.LA DOMIKI E.P.E

Year: 2008

Location: OINOFYTA

Description: Application of Passive Fire Protection System R60min and final topcoat.

 

Unilever Construction Companies

Contractor: AKTOR S.A

Year: 2011

Location: Sximatari

Description: Application of Passive Fire Protection System R30min, R45min, R60min and final topcoat

 

Contractor: CONSTEEL S.A

Year: 2010

Location: AGIOS IOANNIS RENTIS

Description:

  • Epoxy paint system on walls
  • Self leveling Industrial floor
  • Anticorrosion Protection

 

Contractor: J.&P. AVAX

Year: 2007

Location: Marousi

Description: Industrial floor

Cash & Carry – My Market Construction Companies

ΜΥ ΜΑΡΚΕΤ

Contractor: Κ. KOULOURAS & SIA O.Ε

Year: 2012

Location: Kapandriti

Description: Application of Passive Fire Protection System R60min and final topcoat.

 

CASH & CARRY

Contractor: ΚON. KOULOURAS & SIA E.E

Year: 2012

Location: Kilkis

Description: Application of Passive Fire Protection System R60min and final topcoat.

 

CASH & CARRY

Contractor: ΚON. KOULOURAS & SIA E.E

Year: 2012

Location: Giannitsa

Description: Application of Passive Fire Protection System R60min and final topcoat.

 

CASH & CARRY

Contractor: ARIS CHEILAKOS & SIA O.E

Year: 2010

Location: Sparti

Description: Application of Passive Fire Protection System R60min and final topcoat.

 

CASH & CARRY

Contractor: CONSTEEL S.A

Year: 2009

Location: Kalamata

Description: Application of Passive Fire Protection System R60min and final topcoat.

 

CASH & CARRY

Contractor: DS STEEL S.A

Year: 2006

Location: Mandra Attikis

Description: Εφαρμογή Συστήματος Παθητικής Πυροπροστασίας R60min και τελικής επίστρωσης.

 

CASH & CARRY

Contractor: DS STEEL S.A

Year: 2006

Location: Ksanthi

Description: Application of Passive Fire Protection System R60min and final topcoat.

TOP
tdchrom

T: 210 5595055
F: 210 5595036

info@tdchrom.com
google map

ΑΡ. ΓΕΜΗ 128896208000

© tdchrom 2025 | website by NoMatter